Naval

KONINGSDAM - PUBLIC RR

Development of 18 public restrooms Architectural, Engineering, and Production Drawings under the 2010 ADA Standards. For this project, our team had the scope of Survey for the project development during the service of the ship, the development of the plans as a result of the survey, development of the Demolition Plans (illustrating all the items to be removed or substituted) the 2010 ADA Proposal plan and the Material Plan. After that, we have been encharged of following the Drydock development as the assistance of PM and ADA consultants for a project approved by the end client.